The 2 cabin boards near the engine came with the boat in a pretty bad shape, they were in need of some love. I decided the risk was very low to exercise my varnishing skills on these boards. The result happened to be way better than I expected.
Update March 2019. After this rainy winter and couple of leaks, it’s time to do the forward cabin floor board.
Protect the fuel line from chafing, not sure how I missed them during my last chafing protection mission.
New priority project on Hotel Catalina! Let’s see how many week-end will I need to get it fixed 🙂
Helm tear down and fixing
Most of this section is coming from this document from Edson Marine. Edson Marine has been very helpful to answer my questions about the different part numbers I was not able to find around.
Easier than expected! I was able to get it out pretty easily with an easy out screw extractor after I drilled a small hole in it with a 1/16″ cobalt drill bit.
Remove the compass
The 3 first ¼”-20 x 3 ½” ¼”-20 x 4” stainless machine screw came out very easily and of course as usual one didn’t come at all after a lot of drilling and one drill bit broken I succeeded to get the compass out with only one screw to replace!
Remove housing
Remove broken ¼”-20 x 3 ½” ¼”-20 x 4” stainless machine screw
At the beginning based on documentation and online information I ordered by mistake 3 ½” machine screws where needed 4″ long screws.
¼”-20 x 4” stainless and should be coated with Tef Gel when installing.